Showing posts with label Cantarch. Show all posts
Showing posts with label Cantarch. Show all posts

Tuesday, 21 January 2014

Making // DAY 5 // Completing frame construction

Panels have  finally taken shape to form the main framework... the installation's coming on steadily! Drawings to follow :)
Latest developments:

Maze frame: directional wayfinding setup (Photo: Tina Zacharia)

Entrance corridor to central projection atrium (Photo: Tina Zacharia)

Lower beam to column joinery detail (Photo: Tina Zacharia)

Making // DAY 4 // Testing frame assembly





Test assembly complete!! (All photos : Tina Zacharia)

Friday, 17 January 2014

Making // DAY 3 // Panel Assembly


A very productive day in (and out of ) the workshop today, besides the very British weather! After finishing jig sawing the last 8 or so sections, Ben and I began to puzzle the pieces together....













             








All photos and stills (Tina Zacharia)













Wednesday, 15 January 2014

Making // DAY 2 // Jigsaw fun!!

After double checking dimensions against the timber schedule, technician Ben and I began to jigsaw and chisel our way through the 40 sections:


Video stills (Photos: Tina Zacharia)







All Photos: Tina Zacharia
Its slowly coming together!! :)

Monday, 13 January 2014

Making // DAY 1 // Marking timber sections







The timber has finally arrived; all 40 150 x47mm of it! Have spent a good day in the workshop marking up the timber ready for jigsawing: Cant wait to begin constructing the frame!



 Marking wood using jig (photo: Tina Zacharia)

Laser cut jigs (photo: Tina Zacharia)